Specialist Plastering

historic building restoration, ornamental mouldings, bespoke surface finishes

Skip to content
  • Home
    • Skills
    • Resources
  • Blog
  • Portfolio
    • commercial
    • residential
    • conservation
    • mouldmaking
    • specialist finishes
  • Contact
  • Links
Search

portfolio

Our skills cover a wide range of specialist trades, please take a look at some of our projects.

commercial

conservation

mouldmaking

residential

specialist finishes

To see our project archive click Here

Follow @ukartisan

View Dave lawton's profile on LinkedIn

Instagram

Search this site

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 1,879 other followers

Archives

Pages

  • BLOG
  • contact
  • Home
    • resources
    • Skills
  • Links
  • portfolio

  • 9,697 hits
  • View @ukartisan’s profile on Twitter
  • View specialistplastering’s profile on Instagram
  • View specialistplastering’s profile on LinkedIn
  • View specialistplastering’s profile on YouTube

Instagram

When leaves block a gutter or downpipe, deal with it, don't leave it. The damage caused by the neglect of this building was entirely due to poor maintenance, this is a very extreme example, almost 100 years passed by and led to this condition, If the roof and rainwater goods had been maintained the structure would have remained in a salvagable condition, Yet, blocked drains, gutters and downpipes allowed rain inside, causing timbers to rot and the structural damage began. Without intervention, the damage would have caused collapse and the building would be lost. #conservation #restoration #wirral #cheshire #lime #hot #drone #beforeafter
Guess who's back! I didn't really have a break from work. More of a personal breakdown/ breakup that knocked me a bit. A very emotional time but hopefully for the best. We worked solid the last month to finish off the restoration project and hand over the keys after 18 very tough months. Over 600 tonnes of earth were brought in to landscape the exterior grounds. Whilst the interior was finished, fully redecorated, carpeted and cleaned. People said it couldn't be done. The building should be pulled down and it was too big a project for me to take on. Fuck em.. Have a vision, make a plan and stick to it. Anything is possible if you want it to be. Ill add some more photos from the project in time and in the future will share many more... For now I'm going to concentrate on myself and my girls #conservation #restoration #wirral #cheshire #lime #hot #downbutnotout
Taking a break from it all for a while. I'll be back..........
A selection of images taken during April 2017. 12 months ago. We were pretty deep into the restoration at this stage. #conservation #restoration #wirral #cheshire #lime #hot #drone #360photo #kodakpixprosp360
Blog at WordPress.com.