Most of the bench run pieces are now finished and slowly curing so as the weather begins to warm up we have been able to begin setting out and running the first of the in situ mouldings.
The gable had been rebuilt following collapse and the moulding shown here was copied from old pictures.
This week we will set out and run a further bull nosed weather moulding around 4 inches above this one and continuing around the side elevations with a curved feature